Gas Well Installation

These are recommended components to make a complete plunger lift installation.

  1. Downhole Spring Assembly
  2. Plunger
  3. Lubricator, Catcher, and Flow Tee Combo
  4. Control Valve
  5. Drip Pot Regulator / Gauge Assembly
  6. Electronic Controller (APC 1000)
  7. The Arrival Switch

HOME